Genuine Festo product
Product family
GFCH
Commissioning service
Our local service specialists will correctly commission your handling system and ensure it interacts optimally with the overall system. This prevents malfunctions, loss of performance and premature wear.
Highlights
- Commissioning services for handling systems
- Available for 1, 2 and 3-axis systems with and without safety module, remote or local
- Inspection of the cabling, electrical and pneumatic connections as well as travel distances and energy chains
- Configuration and parameterisation, incl. optimisation of the controller parameters and homing
- Activation of components in test mode
- Data backup and documentation
- Instruction for machine operators
Price and delivery are confirmed with the quote. Requests received during business hours are answered the same day.
Products in this product family
14 variants| Product | Part no. | Work involved on site | Design | ||
|---|---|---|---|---|---|
| GFCH-1-R Remote commissioning | 8136842 | 2 working hours | — | ||
| GFCH-2-R Remote commissioning | 8136843 | 3.5 working hours | — | ||
| GFCH-3-R Remote commissioning | 8136844 | 5 working hours | — | ||
| GFCH-1-G-R Remote commissioning | 8136845 | 3 working hours | — | ||
| GFCH-2-G-R Remote commissioning | 8136846 | 5 working hours | — | ||
| GFCH-3-G-R Remote commissioning | 8136847 | 7 working hours | — | ||
| GFCH-1 Commissioning | 8044339 | 3 working hours | Single-axis system | ||
| GFCH-2 Commissioning | 8044340 | 5 working hours | Two axes system | ||
| GFCH-3 Commissioning | 8044341 | 7 working hours | Triple axis system | ||
| GFCH-1-G Commissioning | 8044342 | 4 working hours | Single-axis system with safety module CAMC-G-S3 | ||
| GFCH-2-G Commissioning | 8044343 | 6.5 working hours | Twin-axis system with safety module CAMC-G-S3 | ||
| GFCH-3-G Commissioning | 8044344 | 9 working hours | Triple axis system with safety module CAMC-G-S3 | ||
| GFCH-A2-R Remote commissioning | 8141577 | 3 working hours | Motor controller integration into the higher-order controller – remotely | ||
| GFCH-A2 Commissioning | 8141549 | 4 working hours | Integrating the motor controller into the higher-order controller – locally |